Security & compliance hardening
SLO-based operations
The prototype that closed your first customers is now the thing between you and the enterprise deal: the security questionnaire, the load spike, the SSO requirement, the audit. We take products from MVP to enterprise-grade — re-architecting, hardening, and operationalizing without freezing the roadmap or rewriting from scratch.
Wyoming C-Corp · Dallas HQ · 585 engineers on tap
monthly transactions scaled
big-bang rewrites
years doing exactly this
The playbook
Rewrites kill companies. We modernize in slices — every sprint ships value while the architecture improves underneath.
01 / ASSESS
Two weeks: codebase, infrastructure, data model, security posture, and the enterprise requirements you’re about to hit. Output: a sequenced hardening roadmap.
02 / STABILIZE
Observability, error budgets, CI/CD, staging parity, backup/restore drills — the operational floor before any refactor.
03 / RE-ARCHITECT
Extract services from the monolith where scale demands it, fix the data model, introduce queues and caching — behind stable interfaces, with the product still shipping.
04 / CERTIFY + OPERATE
SOC 2 / HIPAA / PCI-readiness engineering, pen-test remediation, SSO/SCIM, audit logging — then SLO-based operations with runbooks and on-call.
What gets hardened
SCALE
Query optimization, caching layers, horizontal scaling, load testing against 10–100× current traffic.
SECURITY
Threat modeling, dependency hygiene, encryption at rest/in transit, secrets management, pen-test remediation.
COMPLIANCE
Control mapping, audit logging, data retention, BAA-friendly architecture — engineering the evidence, not just the policy doc.
ENTERPRISE IT
SAML/OIDC single sign-on, user provisioning, granular roles — the checklist items that unblock six-figure deals.
RELIABILITY
Error budgets, alerting that means something, runbooks, and a 3am story that ends well.
DATA
The data model your MVP deserved, migrations without downtime, and analytics your board can trust.
Selected Production Work
FAQ
No — that’s the point of the strangler-fig approach. We typically run 70/30: most of the team’s capacity keeps shipping product while the hardening track improves the foundation in parallel.
Preferred. We embed as an E-Team alongside your engineers, transfer the patterns as we go, and hand off runbooks and ownership — the goal is your team operating an enterprise-grade system, not a dependency on us.
Yes, with a migration first: because we build LowCode MVPs with externalized data and auth, we move frontends to native (React/Flutter) without a user reset. If your MVP wasn’t built that way, the assessment covers the safest extraction path.
Typical: SSO + audit logging + security-questionnaire readiness in 6–10 weeks; SOC 2 Type I evidence readiness in one to two quarters depending on starting posture. The two-week assessment gives you a dated plan.
A 30-minute architecture conversation with a senior engineer. We’ll tell you what’s real, what’s checkbox, and what it takes.
MVP to Enterprise · Wyoming C-Corp · [email protected]