Security & compliance hardening
SLO-based operations
The prototype that closed your first customers is now the thing between you and the enterprise deal: the security questionnaire, the load spike, the SSO requirement, the audit. We take products from MVP to enterprise-grade re-architecting, hardening, and operationalizing without freezing the roadmap or rewriting from scratch.
Wyoming C-Corp · Dallas HQ · 585 engineers on tap
monthly transactions scaled
big-bang rewrites
years doing exactly this
The playbook
Rewrites kill companies. We modernize in slices every sprint ships value while the architecture improves underneath.
01 / ASSESS
Two weeks: codebase, infrastructure, data model, security posture, and the enterprise requirements you’re about to hit. Output: a sequenced hardening roadmap.
02 / STABILIZE
Observability, error budgets, CI/CD, staging parity, backup/restore drills the operational floor before any refactor.
03 / RE-ARCHITECT
Extract services from the monolith where scale demands it, fix the data model, introduce queues and caching behind stable interfaces, with the product still shipping.
04 / CERTIFY + OPERATE
SOC 2 / HIPAA / PCI-readiness engineering, pen-test remediation, SSO/SCIM, audit logging then SLO-based operations with runbooks and on-call.
What gets hardened
SCALE
Query optimization, caching layers, horizontal scaling, load testing against 10 100× current traffic.
SECURITY
Threat modeling, dependency hygiene, encryption at rest/in transit, secrets management, pen-test remediation.
COMPLIANCE
Control mapping, audit logging, data retention, BAA-friendly architecture engineering the evidence, not just the policy doc.
ENTERPRISE IT
SAML/OIDC single sign-on, user provisioning, granular roles the checklist items that unblock six-figure deals.
RELIABILITY
Error budgets, alerting that means something, runbooks, and a 3am story that ends well.
DATA
The data model your MVP deserved, migrations without downtime, and analytics your board can trust.
Selected Production Work
FAQ
No that’s the point of the strangler-fig approach. We typically run 70/30: most of the team’s capacity keeps shipping product while the hardening track improves the foundation in parallel.
Preferred. We embed as an E-Team alongside your engineers, transfer the patterns as we go, and hand off runbooks and ownership the goal is your team operating an enterprise-grade system, not a dependency on us.
Yes, with a migration first: because we build LowCode MVPs with externalized data and auth, we move frontends to native (React/Flutter) without a user reset. If your MVP wasn’t built that way, the assessment covers the safest extraction path.
Typical: SSO + audit logging + security-questionnaire readiness in 6 10 weeks; SOC 2 Type I evidence readiness in one to two quarters depending on starting posture. The two-week assessment gives you a dated plan.
A 30-minute architecture conversation with a senior engineer. We’ll tell you what’s real, what’s checkbox, and what it takes.
MVP to Enterprise · Wyoming C-Corp · [email protected]